Glynwood Farms Access Road

Project Details

This project consisted of installing 750 LF of a new access road through an existing farm hillside. Topsoil was stripped, and over 5,000 CY of fill was excavated and hauled off-site. There were also drainage improvements including rip-rap swales and several drainage crossings across the new road. Additionally, road base material was put down and the road was paved. All earthmoving and grading was done with GPS automated excavators and bulldozers which allowed us to get this project done in such a timely fashion.

Owner

Glynwood Farms

Type of Project

Commercial Site Development

Scoped Performed

Road Construction, Mass Excavation, Grading, Drainage, Asphalt Paving, GPS Grading

Duration

1 month