Manhattan Beer Distributor

Project Details

Constructing a new 120,000 SF warehouse between the two existing warehouse structures.

Owner

Manhattan Beer Distributor

Type of Project

Commercial Site Development

Scoped Performed

Water Main Installation, Sewer Main Installation, Drainage Systems, Earthwork (Cut/Fill, Grading, Shaping Pond), Building Excavation (Slab Prep, Excavate Foundation/Footings), Concrete Masonry (Curbs, Sidewalks, Utility Slab), Asphalt Paving, Site Demolition (Hammering Concrete Stem Walls and Slabs)

Duration

12 Months