Manhattan Beer Distributor
Project Details
Constructing a new 120,000 SF warehouse between the two existing warehouse structures.
Owner
Manhattan Beer Distributor
Type of Project
Commercial Site Development
Scoped Performed
Water Main Installation, Sewer Main Installation, Drainage Systems, Earthwork (Cut/Fill, Grading, Shaping Pond), Building Excavation (Slab Prep, Excavate Foundation/Footings), Concrete Masonry (Curbs, Sidewalks, Utility Slab), Asphalt Paving, Site Demolition (Hammering Concrete Stem Walls and Slabs)
Duration
12 Months