Mondelez Warehouse

Project Details

This 9 acre site consisted of building a new 115,000 SF warehouse for Mondelez International, better known for producing the cookie we all know and love- Oreo. The existing site was cleared and ready for stumping and grubbing, in which we pulled all stumps and ground on-site to create mulch for stabilization. Over 35,000 CY of structural fill was imported and placed in 12” lifts for the building pad and parking lots. The building slab was prepared to a tenth of an inch using our laser controlled bulldozer. Nearly 2,500 LF of 12” water main was installed, along with thousands of feet of drainage as well as a 300 unit underground Cultec infiltration system. We also performed all site concrete and imported 4,000 CY of quarry process for asphalt base which was graded using GPS automation.

Owner

Mondelez International

Type of Project

Industrial Site Development

Scoped Performed

Stumping and Grubbing, Mass Excavation & Grading, Import Fill, Rock Removal, Drainage Systems, Sewer Force Main & Pump Station, Water Mains, Building Slab Prep, Concrete Curbs and Sidewalks, Asphalt Sub-Base & Prep, GPS & Laser Automated Grading.

Duration

9 Months

Have a Project?

All of your site development needs under one roof.

Contact us today to learn how we can partner together on your next project.

Scroll to Top